This streetscape renewal project included
the design of pavement, planter strip, and irrigation improvements
along a highly traveled portion of March Lane sidewalk that
had been significantly damaged by the roots from planter strip
trees. In coordination with a consulting arborist, Callander
Associates developed a sidewalk cross section that would provide
a safe, accessible pedestrian walkway without sacrificing
any of the existing mature street trees. The long-term sustainability
of both the trees and the sidewalk were a priority in the
design process.
|