The idea for a lighted all-weather
synthetic turf soccer field at City Park began to gain momentum
as the City recognized the unmet field needs of the community.
Centrally located City Park would serve as an ideal location
for this new facility. The proposed soccer field is complementary
with the existing lighted fields for baseball and softball
at City Park. The City contracted with Callander Associates
in the summer of 2006 to assist in the development of construction
documents. A rapid design development phase was undertaken
to address issues not specifically dealt with in the existing
master plan. Challenges such as provisions for fire access,
improved pedestrian and vehicular circulation were addressed
and resolved. Mature eucalyptus trees surround the project
site and provided additional challenges. Grading for the field
and the parking lot needed to respect these large and beautiful
trees to remain. The project is slated for completion in 2007,
providing the community with a greatly enhanced soccer facility
at City Park that can be used after sunset and during almost
any rainfall event. |